ECOLOGICAL CHARACTERIZATION IN THE CONTEXT OF REPLACEMENTS OF RAILWAY CULVERTS LOCATED IN HUDSON AND BLAINVILLE

2021-2022

EXO is responsible for the infrastructure relating to the operation of these public transport services. As part of its duties, exo must replace various railway culverts.

As part of this project, T2 Environnement (T2) carried out the characterization of wetlands and bodies of water located in the sector of the work to be carried out in accordance with the requirements of article 46.0.3 of the Water Quality Act. ‘environment.

T2 also characterized the fish habitat, noted the main invasive exotic species and verified the presence of floral species with a precarious conservation status.

Finally, T2 collaborated with Génipur to develop a project concept to minimize the importance of potential impacts and actively collaborate in drafting a request for advice intended for the DFO.